Replacing a sunken two-car driveway
The old slab is broken out, soft fill is dug out and new stone is compacted. Then a 5-inch slab goes in, pitched away from the garage.

Six kinds of concrete driveway work we do, with what each one involves.
The old slab is broken out, soft fill is dug out and new stone is compacted. Then a 5-inch slab goes in, pitched away from the garage.

A line pump carries concrete through a narrow alley to a small pad, with the slab pitched back toward the alley.

The slab is saw-cut at the door, a channel is set in a concrete collar and a pipe runs to daylight lower on the lot.

A stiffer mix goes in from the bottom up, and the surface is washed at the right time to show the stone.

The permit is posted, the old apron comes out and a 6-inch slab with steel goes in, with a smooth transition to the curb.

A strip is added along one side, with dowels drilled into the old slab and joints lined up with the existing ones.

A free site visit, a written quote and a slab built for Pittsburgh winters. Bonded and insured.